Capital East

Residential Development, Victoria Dock, London, E16. Unit beams at ground level over weak dock to support 18 x 3m lifts of scaffolding.

Main Contractor: Barratt East London.     Scaffolding Contractor: Rapid Brickwork Ltd.

                   

                             

                             

                             

To view the technical drawings relating to this project as PDF files, please click on the links below:

Drawing 1       Drawing 2        Drawing 3        Drawing 4

 

If you do not have Adobe Acrobat Reader, please click here to download it for free.

 

 

© axial solutions ltd 2005